News
Kabinda, Angola
Posted on 21/05/2008

Finalization of the warehouses contracted by Group MUSHROOM, for LIMITED LIABILITY COMPANY to water network of Kabinda (Angola).
The first warehouse, ETA 1 (500 m3s), was installed in September 2007 to reinforce the supply of the local network (Urban Center, Provincial Hospital, Governor Palace, Harbor Zone…).
In April 2008, three dwells warehouses were manufactured and assembled. Two of 100 m3s in the same location, and to another one of 50 m3s in the nearby City of Small Luando (Cacongo).
TANKEROS, S.L is therefore playing an activates role along with to other companies (Bascotecnica and MUSHROOM) in the challenge to create vital infrastructure ace the ones dedicated to the supply of to water, where they plows the most needed.
